File #: Details 2022-184    Version: 1 Name:
Type: M - Miscellaneous Status: Agenda Ready
File created: 9/1/2022 In control: PUC Agenda Meeting
On agenda: 9/22/2022 Final action:
Title: * E999/CI-17-879; Minnesota Investor-Owned Electric Utilities E002/M-21-694; E015/M-21-390; E017/M-21-612 In the Matter of a Commission Inquiry into Electric Vehicle Charging and Infrastructure; In the Matter of Xcel Energy's 2021 Integrated Distribution System Plan; In the Matter of Minnesota Power's 2021 Integrated Distribution System Plan; In the Matter of Distribution System Planning for Otter Tail Power Company. Should the Commission combine Minnesota Power, Otter Tail Power, and Xcel Energy's Transportation Electrification Plans (TEPs) with their Integrated Distribution Plans (IDPs)? (PUC: Terwilliger)
Attachments: 1. PUC Notice 7-1-22.pdf, 2. DOC Comments 8-1-22.pdf, 3. CEG Comments 8-1-22.pdf, 4. Xcel Comments 8-1-22.pdf, 5. MP Comments 8-1-22.pdf, 6. OTP Comments 8-1-22.pdf, 7. Xcel Reply Comments 8-11-22.pdf, 8. OTP Reply Comments 8-11-22.pdf, 9. Briefing Papers
Date Ver.Action ByActionAction DetailsMeeting Details
No records to display.

title

*                     E999/CI-17-879;                     Minnesota Investor-Owned Electric Utilities

                     E002/M-21-694;

                     E015/M-21-390;

                     E017/M-21-612

In the Matter of a Commission Inquiry into Electric Vehicle Charging and Infrastructure;

In the Matter of Xcel Energy’s 2021 Integrated Distribution System Plan;

In the Matter of Minnesota Power’s 2021 Integrated Distribution System Plan;

In the Matter of Distribution System Planning for Otter Tail Power Company.

 

Should the Commission combine Minnesota Power, Otter Tail Power, and Xcel Energy’s Transportation Electrification Plans (TEPs) with their Integrated Distribution Plans (IDPs)? (PUC: Terwilliger)