Details 2019-099
| 1 | 1. | | SA - Service Area | E120,241/SA-19-331 City of Glencoe;
McLeod Cooperative Power Association
In the Matter of the Revised Joint Request of the City of Glencoe and McLeod Cooperative Power Association for Approval to Update Electric Service Territory Records. (PUC: Terwilliger; DOC: Lusti) | |
Action details
|
Details 2019-098
| 1 | 2. | | RP - Resource Planning | * E002/RP-19-368 Xcel Energy
In the Matter of Xcel Energy’s 2020-2034 Integrated Resource Plan.
Should the Commission approve the Xcel Energy request to amend the April 15, 2022 Order in this docket at Order Point 2.A.1 as follows: Each year through 2034, Xcel shall save, on average, at least 780 gigawatt-hours via energy efficiency. (PUC: Stalpes) | |
Action details
|
Details 2019-100
| 1 | 3. | | CN - Certificate of Need | * IP7006/CN-19-309 Buffalo Ridge Wind Energy, LLC
In the Matter of the Application of Buffalo Ridge Wind, LLC for a Certificate of Need for the 109 MW Large Wind Energy Conversion System in Lincoln and Pipestone Counties, Minnesota.
1. Should the Commission accept the environmental report and the record created in this matter as adequately addressing the issues identified in the environmental report scoping decision?
2. Should the Commission grant a certificate of need for the 109 MW Buffalo Ridge Wind Project proposed in Lincoln and Pipestone Counties? (PUC: Panait) | |
Action details
|
Details 2017-152
| 7 | 4. | | WS - Wind Power Plant Siting | ** IP6946/WS-17-410 Xcel Energy
In the Matter of the Energy Conversion System Site Permit for the 84 MW Freeborn Wind Farm in Freeborn County.
Should the Commission reconsider its August 8, 2022 Order Accepting Post Construction Noise Monitoring Report and Compliance Review? (PUC: Kaluzniak)
The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6) In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting. | |
Action details
|
Details 2018-115
| 2 | 5. | | CI - Commission Initiated Investigation | * G999/CI-18-41 All Commission Rate Regulated
Natural Gas Utilities
In the Matter of a Commission Investigation into Natural Gas Utilities’ Practices, Tariffs and Assignment of Cost Responsibility for Installation of Excess Flow Valves and Other Similar Gas Safety.
Should the Commission accept the March 31, 2020 compliance filings of the natural gas utilities as complying with the Commission’s July 31, 2019 Order? (PUC: Bonnett, Larson) | |
Action details
|