Details 2021-228
| 1 | 1. | | M - Miscellaneous | * E112,E015/SA-20-734 East Central Electric Cooperative;
Minnesota Power
In the Matter of a Petition for Approval of Service Territory Exception Agreement between East Central Electric Association and Minnesota Power (PUC: Terwilliger, DOC: Lusti) | |
Action details
|
Details 2021-224
| 1 | 2. | | M - Miscellaneous | * E111/M-21-203 Dakota Electric Association
In the Matter of the Petition to Clarify Special Fees and Charges for Meters Removed without Authorization.
Should the Commission approve Dakota Electric Association to clarify language on the Special Fees and Charges tariff to recover costs where meters are removed without authorization? (PUC: McShane) | |
Action details
|
Details 2021-223
| 1 | 3. | | PR - Periodic Reports | ** P999/PR-21-8 Local Exchange Carriers;
Eligible Telecommunications Carriers
In the Matter of Annual Certification Related to Eligible Telecommunications Carrier’s (ETCs) Use of the Federal Universal Service Support Required Pursuant to C.F.R. 54.313.
Does the Commission have sufficient documentation through the filed FCC form 481 to be assured that the high-cost funds received by each ETCs have been, and will be, used for their intended purpose, pursuant to 47 C.F.R. § 54.314? (PUC: Fournier) | |
Action details
|
Details 2021-220
| 1 | 4. | | M - Miscellaneous | PULLED
** E002/M-20-812 Northern States Power Company d/b/a Xcel Energy
In the Matter of the Xcel Energy 2020 Hosting Capacity Report Under Minn. Stat. §216B.2425, Subd. 8.
Should the Commission accept or take some other action on Xcel Energy’s 2020 Hosting Capacity Analysis Report? (PUC: DeBleeckere) | |
Action details
|
Details 2021-221
| 1 | 5. | | M - Miscellaneous | ** G011/M-20-405 Minnesota Energy Resources Corporation
In the Matter of the Petition of Minnesota Energy Resources Corporation [MERC] for Approval of the 2019 Gas Utility Infrastructure Cost [GUIC] Rider True-Up Report, 2021 GUIC Rider Revenue Requirements and Revised Surcharge Factors.
1. Should the Commission approve or modify MERC’s proposed 2021 Gas Utility Infrastructure Cost (GUIC) Rider revenue requirement and revised surcharge factors?
2. Should the Commission accept MERC’s GUIC Rider 2019 True-up Report? (PUC: Bonnett, Worlobah) | |
Action details
|