File #: Details 2023-077    Version: Name:
Type: PPL - Petroleum Pipeline Status: Agenda Ready
File created: 5/16/2023 In control: PUC Agenda Meeting
On agenda: 1/7/2025 Final action:
Title: ** IP7109/PPL-23-109 Magellan Pipeline Co., L.P. In the Matter of the Application of Magellan Pipeline Co., L.P. for a Route Permit for the Pipestone Reroute Project in Pipestone County, Minnesota. Should the Commission reconsider its October 22, 2024 Order Adopting Administrative Law Judge Report as Modified, Issuing Routing Permit, and Requiring Cultural and Archaeological Survey? (PUC: Ek) The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6). In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting.
Attachments: 1. MPC Application 4-10-23, 2. MPC App A 4-10-23, 3. MPC App B 4-10-23, 4. MPC App C 4-10-23, 5. MPC App D 4-10-23, 6. MPC App E 4-10-23, 7. MPC App F 4-10-23, 8. MPC App G 4-10-23, 9. MPC App H 4-10-23, 10. MPC 1 App I 4-10-23, 11. MPC 2 App I 4-10-23, 12. MPC 3 App I 4-10-23, 13. MPC App J 4-10-23, 14. MPC PUBLIC App K 4-10-23, 15. PUC Order 8-7-23, 16. PUC Order 10-17-23, 17. DOC Comparable Environmental Analysis Vol 1 3-4-24, 18. DOC Comparable Environmental Analysis Vol 2 App 1A 3-4-24, 19. DOC Comparable Environmental Analysis Vol 2 App 2A 3-4-24, 20. DOC Comparable Environmental Analysis Vol 2 App 3A 3-4-24, 21. DOC Comparable Environmental Analysis Vol 2 App 4A 3-4-24, 22. DOC Comparable Environmental Analysis Vol 2 App 5A 3-4-24, 23. DOC Comparable Environmental Analysis Vol 2 App B 3-4-24, 24. DOC Comparable Environmental Analysis Vol 2 App C 3-4-24, 25. DOC Comparable Environmental Analysis Vol 2 App D 3-4-24, 26. DOC Comparable Environmental Analysis Vol 2 App E 3-4-24, 27. DOC Comparable Environmental Analysis Vol 2 App F 3-4-24, 28. DOC Comparable Environmental Analysis Vol 2 App G 3-4-24, 29. DOC Comparable Environmental Analysis Vol 2 App H 3-4-24, 30. DOC Reply Comments 5-24-24, 31. OAH Findings of Fact 7-17-24, 32. PUC1 Order 10-22-24, 33. PUC 2 Order 10-22-24, 34. PUC 3 Order 10-22-24, 35. PUC 4 Order 10-22-24, 36. PUC 5 Order 10-22-24, 37. Standing Rock Sioux Tribe Letter 11-8-24, 38. Yankton Sioux Tribe First 1 Letter 11-8-24, 39. Yankton Sioux Tribe First 2 Letter 11-8-24, 40. Yankton Sioux Tribe First 3 Letter 11-8-24, 41. Yankton Sioux Tribe Second 1 Letter 11-13-24, 42. Yankton Sioux Tribe Second 2 Letter 11-13-24, 43. Brave Heart Society 1 Letter 11-12-24, 44. Brave Heart Society 2 Letter 11-12-24, 45. Cheyenne River Sioux Tribe 1 Letter 11-12-24, 46. Cheyenne River Sioux Tribe 2 Letter 11-12-24, 47. Lower Brule Sioux Tribe Letter 11-12-24, 48. Lower Sioux Indian Community Letter 11-12-24, 49. Otoe-Missouria Tribe 1 Letter 11-12-24, 50. Otoe-Missouria Tribe 2 Letter 11-12-24, 51. Prairie Island Indian Community Letter 11-12-24, 52. Rosebud Sioux Tribe Letter 11-12-24, 53. Santee Sioux Nation Letter 11-12-24, 54. Shakopee Mdewakanton Sioux Community 1 Letter 11-12-24, 55. Shakopee Mdewakanton Sioux Community 2 Letter 11-12-24, 56. White Earth Nation Letter 11-12-24, 57. Flandreau Santee Sioux Tribe 1 Letter 11-13-24, 58. Flandreau Santee Sioux Tribe 2 Letter 11-13-24, 59. Flandreau Santee Sioux Tribe 3 Letter 11-13-24, 60. Flandreau Santee Sioux Tribe 4 Letter 11-13-24, 61. Flandreau Santee Sioux Tribe 5 Letter 11-13-24, 62. Flandreau Santee Sioux Tribe 6 Letter 11-13-24, 63. Great Plains Tribal Letter 11-13-24, 64. United Tribes of North Dakota Letter 11-13-24, 65. MPC Answers to Petitions 11-18-24, 66. Waka? Tipi Awa?ya?kapi Letter 11-19-24, 67. Briefing Paper, 68. Tuma Amended Permit Language, 69. Magellan decision option.Sieben
Date Ver.Action ByActionAction DetailsMeeting Details
No records to display.

title

**                     IP7109/PPL-23-109                     Magellan Pipeline Co., L.P.

In the Matter of the Application of Magellan Pipeline Co., L.P. for a Route Permit for the Pipestone Reroute Project in Pipestone County, Minnesota.

 

Should the Commission reconsider its October 22, 2024 Order Adopting Administrative Law Judge Report as Modified, Issuing Routing Permit, and Requiring Cultural and Archaeological Survey? (PUC: Ek)

 

The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6). In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting.