Title:
|
** E002/CI-24-115 Northern States Power Co. d/b/a Xcel Energy
In the Matter of a Commission Inquiry into Xcel Energy's Advanced Rate Design for Load Management.
Should the Commission direct Xcel Energy to perform a study evaluating the contribution to Minnesota system costs caused by residential customers with different usage profiles, consulting the Citizen's Utility Board Illinois study as an example? (PUC: Harsch)
|