Title:
|
IP7003/GS-19-395; Regal Solar, LLC
IP7003/CN-19-223
In the Matter of the Application of Regal Solar, LLC for a Site Permit and Certificate of Need for the up to 119.5 MW Regal Solar Project in Benton County, Minnesota.
1. Should the Commission authorize a transfer of the site permit and Certificate of Need?
2. If a permit transfer is authorized by the Commission, what additional conditions, if any, should the Commission impose? (PUC: Lobby; DOC: Levi)
|