Title:
|
** E002/CN-22-532; Northern States Power Co. d/b/a Xcel Energy
E002/TL-23-157
In the Matter of the Application of Xcel Energy for a Certificate of Need and Route Permit for the Mankato - Mississippi 345 kV Transmission Line Project in Southeast Minnesota.
1. Are there any alternative routes or route segments that should be studied to mitigate potential impacts associated with the proposed project?
2. Are there any unique characteristics of the proposed routes or the project that should be considered? (PUC: Panait)
|