|
Title:
|
** ET6125/RP-25-266 Basin Electric Power Cooperative
(Basin Electric or the Cooperative)
In the Matter of Basin Electric Power Cooperative's Optional Integrated Resource Plan.
1. Should the Commission grant Basin Electric's request to extend its IRP filing date until October 1, 2027?
2. If the Commission grants the Cooperative's request, should the Commission require an interim filing? (PUC: Stalpes)
|