Title:
|
** E999/PR-19-9 Minnesota Power;
Otter Tail Power;
Xcel Energy
In the Matter of Trade Secret Designations of 2019 Cogeneration and Small Power Production Reports.
Should the Commission grant the Joint Commenters' Petition for Rehearing or Reconsideration? (PUC: Rosier)
The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6) In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting.
|