|
Title:
|
** E015/GR-21-335; Minnesota Power
E015/GR-23-155
In the Matter of the Application of Minnesota Power to Increase Rates for Electric Service in the State of Minnesota.
Following the Court of Appeals remand, how should the Commission resolve Minnesota Power’s request to include in rate base the amount claimed as a prepaid pension asset and earn a return at the Commission-authorized weighted average cost of capital?
Should the prepaid pension asset be recovered through rate base, or by another method, and if so, how much of Minnesota Power’s claimed prepaid pension asset should be included in rate base, and what rate of return? (PUC: Manning)
|