title
* E015/GP-13-978 Minnesota Power
In the Matter of the Application of Minnesota Power for a Gas Pipeline Routing Permit for the Laskin Energy Center Natural Gas Pipeline Project.
Should the Public Utilities Commission grant a partial exemption from pipeline route selection procedures and issue a pipeline route permit for the approximately 5,900-foot, up to 10.75-inch outside diameter natural gas pipeline to serve the Laskin Energy Center located in the city of Hoyt Lakes, Minnesota? (PUC: DeBleeckere)