| 3 | 1. | | PPL - Petroleum Pipeline | ** IP7109/PPL-23-109 Magellan Pipeline Co., L.P.
In the Matter of the Application of Magellan Pipeline Co., L.P. for a Route Permit for the Pipestone Reroute Project in Pipestone County, Minnesota.
Should the Commission reconsider its October 22, 2024 Order Adopting Administrative Law Judge Report as Modified, Issuing Routing Permit, and Requiring Cultural and Archaeological Survey? (PUC: Ek)
The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6). In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting. | |
Action details
|
Details 2023-114
| 2 | 2. | | CN - Certificate of Need | ** E015/CN-22-607; Minnesota Power (ALLETE)
E015/TL-22-611
In the Matter of the Application of Minnesota Power for a Certificate of Need and Route Permit for a High Voltage Transmission Line for the HVDC Modernization Project in Hermantown, Saint Louis County.
Should the Commission reconsider its October 25, 2024 Order Granting a Certificate of Need and Issuing a Route Permit? (PUC: Eknes, Lobby)
The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6). In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting. | |
Action details
|
Details 2024-215
| 1 | 3. | | M - Miscellaneous | ** E-017/M-24-186 Otter Tail Power Company
In the Matter of Otter Tail Power Company’s Petition for Approval of the Annual Update to its Electric Utility Infrastructure Rider, Rate Schedule 13.11.
Should the Commission approve Otter Tail Power’s proposal to increase rates in the Company’s Electric Utility Infrastructure Cost Rider to take affect the 1st day of the month following approval? (PUC: Willette) | |