Details 2025-274 11. CI - Commission Initiated Investigation***E-999/CI-24-352 All Electric Utilities In the Matter of a Commission Investigation into a Fuel Life-Cycle Analysis Framework for Utility Compliance with Minnesota’s Carbon-Free Standard. Should the Commission adopt a fuel life-cycle analysis framework as part of its responsibility to set criteria and standards for evaluating utility compliance with Minnesota’s Carbon-Free Standard? (PUC: Winner)  Not available
Details 2025-020 32. GS - Power Plan Siting Non-wind* E015/GS-24-425; Minnesota Power E015/TL-24-426 In the Matter of the Joint Application of Minnesota Power for a Site and Route Permit for the 85-megawatt Boswell Solar Project and Associated 2.45-mile, 230-kilovolt Transmission Line in Itasca County, Minnesota. 1. Should the Commission adopt the administrative law judge’s findings of fact, conclusions of law, and recommendation? 2. Should the Commission determine that the environmental assessment and the record created at the public hearing adequately address the issues identified in the scoping decision? 3. Should the Commission grant a site permit for the up-to-85-megawatt Boswell Solar Project in Itasca County? 4. Should the Commission grant a route permit for the 2.45-mile, 230-kilovolt transmission line associated with the Boswell Solar Project in Itasca County? (PUC: Ek)  Not available
Details 2018-116 53. M - Miscellaneous* E015/M-12-1359 Minnesota Power In the Matter of Minnesota Power’s request for modification to its Service Extension Tariff. Should Minnesota Power’s request for approval to modify its service Extension Tariff be granted? (PUC: Ubani)  Not available
Details 2025-275 14. CI - Commission Initiated Investigation** E002,015,017/CI- Northern States Power Co. d/b/a Xcel Energy; 24-288 Minnesota Power; Otter Tail Power Co. In the Matter of Establishing Tariffs for Distribution System Costs Sharing for Interconnection in Constrained Areas. What generic standards should the Commission adopt for the Distribution System Reactive Upgrades Process (DSRUP)? (PUC: Duran)  Not available