Details 2026-148
| 1 | 1. | | ESS - Energy Storage System | * IP7180/ESS-26-184 LSP CG Storage, LLC
In the Matter of the Application of LSP CG Storage for a Site Permit for the up to 80 MW Cottage Grove BESS Project in Cottage Grove, Washington County, Minnesota.
1. Should the Commission require an addendum to the Environmental Assessment (EA) for the project?
2. If an addendum is required, should the Commission authorize the Executive Secretary to approve the scope of an EA addendum?
3. If an addendum is required, should the Commission extend the six-month statutory deadline for the Commission to make a decision (not to exceed nine months)?
4. Should the Commission issue the draft site permit prepared by Energy Infrastructure Permitting Staff (PUC EIP staff), including?the proposed?special permit conditions?
5. Should the Commission?request?that an Administrative Law Judge (ALJ) from the Court of Administrative Hearings (CAH) conduct public hearings for the project and prepare a summary of public testimony as expeditiously as possible?? (PUC: Harvieux; Livingston) | |
Not available
|
|
Details 2025-225
| 2 | 2. | | CN - Certificate of Need | ** E015/CN-25-111 Minnesota Power;
American Transmission Company
In the Matter of the Application of Minnesota Power and American Transmission Company, LLC for a Certificate of Need for the Iron Range - St. Louis County - Arrowhead 345 kV Transmission Project.
1. Are there any contested issues of fact with respect to the representations made in the certificate of need application?
2. Are there other issues or concerns related to this matter? (PUC: Maxon, Johnson) | |
Not available
|
|
Details 2025-219
| 1 | 3. | | CI - Commission Initiated Investigation | ** E999/CI-19-704 All Electric Utilities
In the Matter of an Investigation into Self-Commitment and Self-Scheduling of Large Baseload Generation Facilities.
1. Have the utilities provided adequate information in the 2026 compliance filings on self-commitment?
2. Should the utilities be required to provide additional information or take additional steps regarding self-commitment at this time?
3. Should the filing of this report be combined with the annual fuel-true up reporting, as recommended by Joint Parties in the December 29, 2025 letter?
4. Should the filing requirements for future years be modified? (PUC: Manning, Andringa) | |
Not available
|
|
Details 2025-074
| 1 | 4. | | M - Miscellaneous | ** E002,PT7157/ City of Slayton;
SA-25-129 Northern States Power Co. d/b/a Xcel Energy
In the Matter of the Petition of the City of Slayton for the Determination of Compensation for City Acquisition of Xcel Energy Electric Service Territory.
Should the Commission accept, reject, or modify the Findings of Fact, Conclusions of Law, and Recommendations provided by the Court of Administrative Hearings? (PUC: Noyce) | |
Not available
|
|
Details 2021-331
| 4 | 5. | | CI - Commission Initiated Investigation | ** E999/Cl-16-521 Northern States Power Co. d/b/a Xcel Energy
In the Matter of Updating the Generic Standards for the Interconnection and Operation of Distributed Generation Facilities Established Under Minn. Stat. § 216B.1611.
Should the Commission approve the Technical Subgroup’s proposed changes to the Minnesota Distributed Energy Resource Technical Interconnection and Interoperability Requirements (TIIR) and the Minnesota Distributed Energy Resources Interconnection Process (MN DIP) regarding Battery Energy Storage Systems and Limited/Non-Export Systems? (PUC: Duran) | |
Not available
|
|
Details 2026-146
| 1 | 6. | | M - Miscellaneous | ** P407,405/DTL-26-266 Frontier Communications of Minnesota, Inc.;
Citizens Telecommunications Company of
Minnesota, LLC
In the Matter of Frontier Communications of Minnesota, Inc. and Citizens Telecommunications Company of Minnesota, LLC for Approval of Proposed Customer Transition Plan.
How should the Commission proceed with Frontier Communications of Minnesota and Citizens Telecommunications Co. of Minnesota’s proposed Customer Transition Plan petition? (PUC: Brown-Huss) | |
Not available
|