Details 2019-137
| 2 | 1. | | GS - Power Plan Siting Non-wind | IP7003/GS-19-395; Regal Solar, LLC
IP7003/CN-19-223
In the Matter of the Application of Regal Solar, LLC for a Site Permit and Certificate of Need for the up to 119.5 MW Regal Solar Project in Benton County, Minnesota.
1. Should the Commission authorize a transfer of the site permit and Certificate of Need?
2. If a permit transfer is authorized by the Commission, what additional conditions, if any, should the Commission impose? (PUC: Lobby; DOC: Levi) | |
Action details
|
Details 2021-052
| 1 | 2. | | M - Miscellaneous | ** E015/M-20-814 Minnesota Power
In the Matter of Minnesota Power's Petition for Approval to Track and Defer Lost Large Industrial Customer Sales Resulting from the COVID-19 Pandemic.
Should the Commission grant Minnesota Power’s petition to track and defer Net Lost Revenues resulting from the idling of Keetac and Verso? (PUC: O’Grady, Bender, Manning) | |