Details 2024-176
| 1 | 1. | | M - Miscellaneous | ** E002/M-24-27; Northern States Power Co. d/b/a Xcel Energy;
E015/M-24-29; Minnesota Power;
E017/M-24-30 Otter Tail Power Co.
In the Matter of Northern States Power Co. d/b/a Xcel Energy - Electric’s 2023 Annual Safety, Reliability, and Service Quality Report;
In the Matter of Minnesota Power’s 2023 Annual Safety, Reliability, and Service Quality Report;
In the Matter of Otter Tail Power Co.’s 2023 Annual Safety, Reliability, and Service Quality Report.
1. Should the Commission accept Minnesota Power, Otter Tail Power Co. and Xcel Energy’s 2023 Annual Safety, Reliability and Service Quality Reports?
2. What actions should the Commission take in relation to Xcel Energy’s Interactive Service Quality Map and Equity Analysis? (PUC: Noyce; McShane; Terwilliger) | |
Action details
|
Details 2024-175
| 1 | 2. | | CI - Commission Initiated Investigation | ** E002,111,017,015/ All Rate-Regulated Electric Utilities
CI-24-200
In the Matter of Impacts of the “Capacity” Definition in Minn. Stat. § 216.164 and Associated Rules on Net-metering Eligibility for Rate-Regulated Utilities.
Should the Commission reconsider its January 23, 2025 Order which delegated authority to the Executive Secretary to open a new rulemaking proceeding to clarify that “capacity,” as defined under Minn. Stat. § 216B.164, subd. 2a (c), for purposes of eligibility for net-metering in Minn. Stat. § 216B.164, subd. 3(d), is determined by, and measured at, the qualifying facility’s inverter or a power control system or supplemental device that controls production at the qualifying facility before the net-metered customer’s load? (PUC: Brown-Huss)
The Commission has the authority to accept or decline a petition for reconsideration with or without a hearing or oral argument (Minnesota Rules 7829.3000, Subpart 6). In other words, a decision on a petition for reconsideration can be made without taking oral comments at the Commission meeting. | |
Action details
|