Details 2022-170
| 1 | 1. | | M - Miscellaneous | * P999/M-22-224 All Local Exchange and Interexchange Carriers
In the Matter of a Petition to Order Discontinuance of Service to Revoked Carriers and Carriers that have Relinquished their Certificates of Authority. (PUC: Fournier; DOC: Dietz, Tiamiyu) | |
Action details
|
Details 2022-171
| 1 | 2. | | M - Miscellaneous | * E002/M-22-161 Xcel Energy
In the Matter of Xcel Energy’s Renewable*Connect Pilot Program Compliance Filing. (PUC: Noyce; DOC: Nissen) | |
Action details
|
Details 2021-282
| 2 | 3. | | CI - Commission Initiated Investigation | * G999/CI-21-566 All Natural Gas Regulated Utilities
In the Matter of Establishing Frameworks to Compare Lifecycle Greenhouse Gas Emission Intensities of Various Resources, and to Measure Cost-Effectiveness of Individual Resources and of Overall Innovative Plans.
What energy efficiency and strategic electrification measures are eligible for inclusion in natural gas utility innovation plans? (PUC: Mezic; DOC: Nissen, De, Davis) | |
Action details
|
Details 2022-169
| 1 | 4. | | M - Miscellaneous | * E111/M-22-274 Dakota Electric Association
In the Matter of the Petition of Dakota Electric Association to Modify its Cogeneration and Small Power Production Tariff to Allow Retail Net Metering for Irrigation Service. (PUC: Terwilliger; DOC: Watkins) | |
Action details
|
Details 2022-162
| 1 | 5. | | M - Miscellaneous | * E015/M-19-337 Minnesota Power
In the Matter of Minnesota Power’s Request to Extend its Commercial Electric Vehicle (EV) Rate Pilot. (PUC:Terwilliger; DOC: Davis, Watkins) | |
Action details
|
Details 2021-319
| 1 | 6. | | M - Miscellaneous | * E002/M-21-101; Xcel Energy
E002/M-17-401
In the Matter of Xcel Energy’s Petition for Load Flexibility Pilot Programs and Financial Incentive;
In the Matter of Commission Investigation to Identify Performance Metrics, and Potentially, Incentives for Xcel Energy’s Electric Utility Operation. (PUC: Stalpes; DOC: Zajicek) | |
Action details
|
Details 2022-163
| 1 | 7. | | RP - Resource Planning | * ET9/RP-21-782 Southern Minnesota Municipal Power Agency (SMMPA)
In the Matter of Southern Minnesota Municipal Power Agency’s Submittal of its 2022-2036 Integrated Resource Plan.
1. Should the Commission accept SMMPA’s (SMMPA or Agency) 2022-2036 Integrated Resource Plan (IRP)?
2. Should the Commission require SMMPA to make compliance filings following its IRP?
3. When should SMMPA file its next IRP? (PUC: Harsch; Stalpes) | |
Action details
|
Details 2020-117
| 2 | 8. | | TL - Transmission Line | * ET2/TL-20-423 Great River Energy;
Otter Tail Power Company
In the Matter of Great River Energy & Otter Tail Power Company’s Route Permit for the Frazee to Erie 115-kV Transmission Project in Becker and Otter Tail Counties, MN.
1. What action, if any, should the Commission take on GRE’s letter dated August 26, 2022, filed in docket ET2/TL-20-423?
2. Does GRE’s request to transplant Showy Lady’s Slipper using an excavator constitute “construction” under Minn. Stat. § 216E.01, Subd. 3?
3. Does GRE’s request to transplant the Showy Lady’s Slipper require a permit amendment? If so, how should the permit be amended? If not, what procedural treatment is appropriate? (PUC: Bruce) (NOTE: Staff briefing papers will be distributed separately.) | |
Action details
|