Details 2022-183
| 1 | 1. | | M - Miscellaneous | * E002/M-15-111; Xcel Energy;
E002/M-17-817; Otter Tail Power;
E002/M-18-643; Minnesota Power
E002/M-19-186;
E002/M-19-559;
E002/M-20-711;
E002/M-20-745;
E002/M-21-101;
E015/M-15-112;
E017/M-20-638
In the Matter of the Annual Electric Vehicle Reports for Minnesota Power, Otter Tail Power, and Northern States Power Company d/b/a Xcel Energy. (PUC: Terwilliger; DOC: Davis) | |
Action details
|
Details 2022-184
| 1 | 2. | | M - Miscellaneous | * E999/CI-17-879; Minnesota Investor-Owned Electric Utilities
E002/M-21-694;
E015/M-21-390;
E017/M-21-612
In the Matter of a Commission Inquiry into Electric Vehicle Charging and Infrastructure;
In the Matter of Xcel Energy’s 2021 Integrated Distribution System Plan;
In the Matter of Minnesota Power’s 2021 Integrated Distribution System Plan;
In the Matter of Distribution System Planning for Otter Tail Power Company.
Should the Commission combine Minnesota Power, Otter Tail Power, and Xcel Energy’s Transportation Electrification Plans (TEPs) with their Integrated Distribution Plans (IDPs)? (PUC: Terwilliger) | |
Action details
|
Details 2022-182
| 1 | 3. | | CN - Certificate of Need | ** PL9/CN-21-823 Enbridge Energy, Limited Partnership
In the Matter of the Decommissioning Trust Fund for the Enbridge Energy, Limited Partnership Line 3 Replacement Pipeline.
1. How should the Decommissioning Trust be structured?
2. Traditional Trust vs Noncharitable Trust?
3. Who should be designated the benefactor?
4. How much money should be included in the Decommissioning Trust?
5. Should there be an initial startup payment and what is the schedule for payments?
6. How often should the Decommissioning Trust be reviewed? (PUC: Janezich) | |
Action details
|